No, you have to install the type of fence that you applied for. If you change your mind you should withdraw the action and apply for your preferred option during the next NPI application window.
You must deliver the length of fencing that was applied for and approved.
No, protective fencing is included in the specifications for a new hedgerow and is paid for as part of the hedegrow action.
For the full details on requirements for this action you should read the Dept. of Agriculture, Food and the Marine’s Specifications for Non Productive Investments. You can find them by clicking here.
Provides the necessary infrastructure for improved Habitat Management
1. This action is for provision of new sheep wire fencing. This means new posts and new wire.
2. Do not attach wire directly to trees.
3. You cannot apply for support under ACRES and TAMS or any other scheme for this action.
4. You cannot use the fence to divide a field or to enclose previously open land.
To reinforce existing boundaries only.
Use new posts and wire. Do not attach wire to trees.
Avoid installing in peatland, rough grazing sites during the bird breeding season (March to August).
Avoid installing on migratory Geese and Swan Sites in Winter.
Do not hinder access to water courses for Otters.
Good Locations:
Poor Locations: